OK, just a little accountability for what I said that we would do this fall. We seem to have done everything except what is on this list.
1) Move the phone cords in kitchen-STILL NOT DONE
2) Repair the hole in the kitchen ceiling-STILL NOT DONE (but definitely on the short list)
3) Repair the hole in the bedroom ceiling-STILL NOT DONE
4) Put in more electrical outlets for office-DONE! There are now 6 new outlets in the office.
5) Put up the face plates in guest room-DONE!
6) Run the electrical to air conditioner-DONE! And we have the heating hooked up and working as well!
7) Put in the plexiglass panel for screen door-DONE!
8) Reassemble the kitchen ceiling fan-STILL NOT DONE (but definitely on the short list)
9) Put in the glass for guest room French door-DONE! Doug did this a couple of weeks ago. It looks great!
10) Get a screen panel for the back screen door-DONE!
11) Shave off the door of the sunroom-DONE! and Doug fixed the latch so the door will actually latch and stay closed
12) Patch the hole in the sunroom wall-NOT DONE (and not on Doug's radar)
13) Put a longer coaxial cord on the tivos so we can move them-DONE!
14) Assemble David’s bed-DONE!
15) Build a bed frame for our bed-DONE Actually we got a frame for our bed from the Labette Freecycle list. I love getting things for free!
16) Get the dining room table and other furniture out of storage-DONE!
17) Hang up a miniblind in David’s room-NOT DONE I really think we have decided against this so it will probably come off the list
18) Cover the french doors in Rachel's room-DONE!
So 7 out of 18 are still not done. 2 will definitely be done before Thanksgiving, one will probably come off the list so it is there is light at the end of the tunnel.
About Me
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment